FP.com

Kearny Board of Education
Masonry Repairs – Four Schools

Overview

Faced with several beautiful but aging schools our client, through a referendum, funded the restoration and repair of four of its early 20th century schools. The repairs at Garfield, Roosevelt, Schuyler and Washington Schools varied for each and totaled over $10,000,000.

Scope of Work
The masonry repair work included:

  • Repointing brick and stone
  • Replacing stone sills, trim and lintels
  • Rebuilding parapets
  • Rebuilding chimneys
  • Re-anchoring brick and stone
  • Installing new flashing
  • Replacing damaged brick and stone
On July 31, 2020
by Karen Psolka
in
  • Home
  • Portfolio
  • About Us
    • Our Studio
    • John Fallon
    • Elizabeth Pacheco
  • Project Experience
  • Awards
  • Contact Us

© Copyright 2020 fallon+pacheco architects